
Crash involving Chicago Tribune truck leaves 1 dead
By Keisha Patel
Advertisement · Why this ad?

Long-term lane reductions are scheduled to begin the week of Nov. 9 on the westbound Reagan Memorial Tollway (Interstate 88) over South Caron Road in Rochelle for bridge work as part of Illinois Tollway repairs on I-88. Closures on South Caron Road will also be needed.Electronic message signs and construction signage are in place to alert drivers to the closures and detour scheduled throughout the work. Up-to-date information will be posted on the Tollway website in the Daily Construction Alert. All work is weather dependent.Beginning the week of Nov. 9, westbound I-88 is scheduled to be reduced to a single lane for bridge deck work over South Caron Road.Also in November, northbound South Caron Road under I-88 is scheduled to close for a week. A detour will be posted routing traffic along Steward Road, Main Street and Steam Plant Road to access South Caron Road.Repair work includes deck sealing, joint cleaning, and bearing replacement and is scheduled to continue through November, with